In construction, specialty items such as plumbing, heating,
electrical, roofing, plastering, and tile work are usually more effectively
performed by subcontract. With so many specialties being performed, subcontract
work becomes a very significant portion of the total costs of construction.
Since each estimate should be prepared as practically and as realistically as
possible, subcontract costs become a necessary consideration. Technical Data
used in the field explained in quantity surveyor courses in Rawalpindi.
Parts of Work to be Subcontracted:
The cost engineer must first determine those parts of the
work that will probably be subcontracted. When the work to be subcontracted has
been determined, those items will be identified in the estimate. The
appropriate subcontractor overhead and profit costs should be applied to
subcontractor direct cost items in addition to the appropriate prime contractor
overhead and profit. Some more details of quantity surveyor courses
in Rawalpindi are as under.
Cost of Subcontracted Work:
The cost of subcontracted work is the total cost to the
prime contractor for the work performed. Subcontractor's costs include direct
labor, materials and supplies, equipment, second tier subcontracts,
mobilization and demobilization, transportation, set-up, and charges for
overhead and profit. Particular attention should be given to large items such
as turbines, generators, and incinerators. The total subcontract cost is
considered a direct cost to the prime contractor.
Construction Contractual Methods:
The cost engineer should be aware of the type of contractual
method for which the solicitation is being issued. Limited competition
contractual procurement methods may result in multiple compounded levels of
subcontracted work, e.g. compounded subcontractors’ markups passed on to the
prime contractor. Some examples of limited contractual procurement methods are
8-A Sole Source RFP, MATOC sole source task order, POCA sole source task order,
etc. The prime contractor is required per the contract to perform a minimum
amount of work, but all the remaining work may be performed by subcontractors.
Particular attention should be given to the workload capacity and workforce
capability of the prime contractor. If the prime contractor already is at full
capacity in performing other work, or their own workforce resources are at
maximum usage, then the prime contractor will likely subcontract to the maximum
extent allowable. Also, the same scenario would occur for the subcontractors if
they are at their maximum capacities.
USE OF QUOTATIONS
The cost engineer may utilize quotes for the expected
subcontracted work when reviewed and verified as reasonable. In lieu of a
quotation, each task of the subcontract should be priced as a direct cost with
an appropriate rate of subcontractor's overhead and profit added. TSK Training
for Skills and Knowledge is the best institute in Rawalpindi Islamabad for
Pakistani Students who wants to join quantity surveyor courses
in Rawalpindi.